/ categories / Art and Photos / @archuture / post #585
3510

On the left banks of the river Iller a new, highly efficient hydro – electric powerstation substituted an older powerstation from the Fifties by now supporting approximately 3000 households with 10,5 million kilowatt – hours of environmentally friendly power per year. Specialised engineering consultants had nearly finished planning the project, until the authorising agency demanded a design, that would fit in a subtly manner into the listed building ensemble of a former spinnery / weavery and the natural space of the Iller.

The starting point of the design considerations was the symbolic representation of the water dynamics, which change from a calm state at the water inlet to the churning and pitching of the water near to the turbines, before subsequently returning to a calm state after the electricity generation.

Despite the huge dimensions a very differentiated formation was created, that on the one hand assimilates the surroundings and on the other hand a self – confident building is now existing, that will get part of a later public hydro-power experience. Public frequency is the consequence of a new continuous track for pedestrians and cyclists along the former weavery and provides an greater impulse for the further contribution of the city towards its river.

👥 becker architekten

⛩ Hydro-electric Powerstation 2010
🇩🇪 Kempten, Germany

#infrastructure


06:06 19.09.18
@archuture
1417 -3

World's best architecture means @archuture. . Follow the change of World's appearance. . Contact us | Канал для связи: @reacharchuture_bot : تماس با ما . Daily astonishing wallpapers and pictures: @SavedColour